Civeo ATS Changeover Works at Blackwater Villages QLD

GAP Industries delivered ATS changeover works in Blackwater QLD for Civeo, covering Waratah Village and Rosewood Village in Central Queensland.

The project included the design and installation of two ATS changeover switchboards integrated into the existing main switchboards. GAP Industries also installed control systems to operate both onsite generators for prime generator changeover.

The works were completed on 1 December 2025, with a total value of $300,000.

Project Details

Field
Detail
Project Name
Civeo at Blackwater ATS Changeover
Delivery Type
Project
Location
Blackwater, covering Waratah Village and Rosewood Village, QLD
Region
Central Queensland
Client or Contractor
Civeo
Project Value
$300,000
Project Date
1 December 2025
Core Scope
ATS changeover works
Switchboard Scope
Design and installation of two ATS changeover switchboards integrated into existing main switchboards
Control Scope
Installation of control systems to operate both onsite generators
Generator Scope
Prime generator changeover
GAP Industries Capability Area
Project Services, Electrical, Design Engineering and Consultation
Site Context
Village electrical infrastructure in Central Queensland

ATS Changeover Works in Blackwater

GAP Industries delivered ATS changeover works for Civeo across two Blackwater village sites.

The scope focused on integrating new ATS switchboards into the existing main switchboards at Waratah Village and Rosewood Village. The project also included control system installation for both onsite generators.

Delivering across two locations required consistent planning, site coordination and electrical installation standards.

Scope of Works Delivered

ATS Switchboard Design and Installation

GAP Industries designed and installed two ATS changeover switchboards for the Blackwater project.

The switchboards were integrated into the existing main switchboards at Waratah Village and Rosewood Village.

Integration with Existing Main Switchboards

The project required integration with existing main switchboards.

This work involved coordination around existing electrical infrastructure and connection requirements at each location.

Generator Control Systems

GAP Industries installed control systems to operate both onsite generators.

These systems were installed to support prime generator changeover across the Blackwater village sites.

Delivery Across Waratah Village and Rosewood Village

The project covered Waratah Village and Rosewood Village in Blackwater.

GAP Industries delivered the ATS switchboard and generator control works across both locations for Civeo.

Safety and Quality Controls

ATS changeover works require careful planning, electrical coordination and clear documentation.

GAP Industries operates under ISO 9001 quality management processes, supporting planning, delivery, documentation and review across electrical project works.

For Civeo, these processes supported switchboard design, installation planning, integration with existing main switchboards and control system works across both Blackwater village sites.

Delivery Value for Civeo

The completed works provided Civeo with two ATS changeover switchboards integrated into the existing main switchboards at Waratah Village and Rosewood Village.

GAP Industries also delivered control systems to operate both onsite generators for prime generator changeover.

The project supported Civeo’s electrical infrastructure requirements across two village sites in Central Queensland.